RCC restored and waterproofed 43 ft on the left wall, excavating to new, underpinned footings, and install new weeping tiles.RCC to overlap each joint by at least 1ft. The new and existing, internal weeping tiles were connected to the existing sump pump at back of left wall. We installed 2 new window wells as well. Learn more about our Etobicoke Waterproofing services
Jobsite Location
Multiple Waterproofing Jobs at Eighth St, Etobicoke, ON