Internal Waterproofing System for Mcgee St, Guelph, ON

The floor in this particular house is about one inch thin. This 50+ year old house, the builders poured the floor on top of the dirt. The building code now requires 4 inched of crushed stone and 4 inch thick concrere floor. Due to the thin floor, the membrane is folded on top of the gravel and weeping tiles to prevent water coming up from the joint where the floor and wall meet. To prevent water coming from  other parts of the floor, the entire floor needs to be removed and properly installed to todays building code standards.Learn more about our