Sales Rep – Kurt
Crew – Omar
RCC installed weeping tile for possible future connection for sump pump. RCC cut pins from previously installed injection best as they can. RCC also chipped out crack, fill with hydro cement, installed DMX membrane and connect under the slabs into drywall. RCC recemented the floor.