Darwin’s crew cut and removed approx. 2 feet high foam insulation and framing. Excavation was done to weeping tile, and a 4″ weeping tile with filter was installed. The crew then installed 2 foot high membranes after items were pulled at least three feet away from exterior walls.
A new 1/2 HP Sump Pump was installed with a basket, lid, check valve, battery back up and discharge line. The new weeping tile was connected to the sump.
If you are interested in these waterproofing services and would like to learn more, head over to our interior waterproofing page.
Sales Consultant: Kurt Tamowski
Crew: Darwin’s Crew
Jobsite Location
Internal Water Management System w/ Sump Pump- East Ave, Kitchener