Paul’s crew installed an internal drainage system along the right side, rear and 5 feet inside the closet totalling 69 lineal feet. Drywall, studs and insulation 48’’ in height were disposed of for installation of plastic air gap drainage membrane. A 4″ weeping tile with filter and 3/4 clear gravel added above, weepers were connected to sump pump.
A new 1/2 HP Sump pump was installed with discharge pipe spilling into rear yard.
If you are interested in these waterproofing services and would like to learn more, head over to our interior waterproofing page.
Sales Consultant: Rick Deagazio
Crew: Paul’s Crew
Jobsite Location
Internal Water Management System & Sump Pump Installation- Treelawn Pkwy, North York