Moe’s crew chipped out cracks, filled them with hydro cement, installed DMX membrane, and connected under the slab into drywall. They then re-cemented the floor.
Sales Consultant: Kurt Tamowski
Crew: Moe’s Crew
Jobsite Location
Internal Water Management System- Landsdown Ave, London