Internal Water Management System – Heath St E (Toronto)

Sales Rep – George

Crew – Omar

RCC installed an internal drainage system on the right wall of the storage room for 2ft, and the back and left wall of the furnace room for 6ft. RCC discharge the system to an existing sump pump along the right wall of the furnace room for 11ft. RCC removed and deposed of 30sq ft drywall and studs.