Darwin’s crew cut and removed approximately 2 feet high foam insulation and framing for the install. They installed 2 feet high air gap drainage membranes and weeping tile. A new 1/2 HP Sump Pump including basket, lid, pump, check valve and discharge line was installed. The weeping tile was connected to the new sump pump.
If you are interested in these waterproofing services and would like to learn more, head over to our interior waterproofing page.
Sales Consultant: Kurt Tamowski
Crew: Darwin’s Crew
Jobsite Location
Internal Water Management System- East Ave, Kitchener