Noel’s crew installed an internal drainage system along the back wall starting at the right wall for 2’, and the
right wall starting at the back wall for 23’. They removed and disposed of 80 sq ft of spray foam and 80 sq ft of drywall/studs. A freeze guard system was installed on the existing discharge on the right wall.
Sales Consultant: George Stoetes
Crew: Noel’s Crew
Jobsite Location
Internal Water Management System-Allen Ave, Toronto