Internal Water Management and Sump Pump Installation – Carlaw Ave, Toronto

Choy’s crew installed an internal drainage system along the entire back wall for 11’, and both the left and right
walls starting at the back wall for 2’ each.  The system was discharged to a new 1/4 hp sump pump and 1/3 hp back up sump pump.
The cavity around a pipe at the back left corner was filled with hydraulic cement to slow the water.

The crew installed a discharge pipe up the back right corner for 6’8″, out the right wall, and to the back along the home for 9′ with a freeze guard.