Project

Internal Drainage System – Central Park Blvd (Oshawa)

Sales Rep –  George

Crew – Omar/Choy

RCC broke the floor down and installed weepers along the front wall starting at the left wall for 14ft and from the front wall through the laundry room door and discharged to the existing sump pump at the back wall for 23ft. RCC removed and disposed all of the debris/concrete. RCC packed the weepers in 3/4 stone and repaired the floor with cement.


Jobsite Location

Internal Drainage System – Central Park Blvd (Oshawa)