Installed an internal drainage system for a total of 98 linear feet. Excavated small trench and installed new 4 inch weeping tiles and connect to drain. Remove drywall and strapping on foundation for installation of plastic membrane. Weepers was covered with 3/4 inch gravel and finish with cement and 14 inches of concrete was removed and disposed on a block foundation in the Spadina Ave and Queen St West area.Learn more about our Toronto waterproofing services.
Jobsite Location
Internal Drainage and Waterproofing for Richmond St W, Toronto, ON