Sales Rep: George Steotes
Crew: Omar
RCC excavated, restored, and waterproofed the entire right wall for 27’, the front wall starting at the right wall for 5’, and the back wall starting at the right wall for 1’. Also installed 2 window wells and a vertical drain along the right wall.
Inside RCC installed a two-stage sump pump with a marine backup battery at the back right corner.
Jobsite Location
External Waterproofing & Sump Pump – Sibley Av, Toronto