The crew waterproofed the left wall, starting at 13.6’ from the front and left wall corner for 6’. They also waterproofed 2’ to the left of the crack & 4’ to the right of the crack.
Excavation was done to weeping tile, and 4″ weeping tile with filter with 3/4 clear gravel added above. Weepers were connected to existing discharge. The crack above grade was patched with hydraulic cement.
Sales Consultant: Nicholas Theodorou
Crew: Canroy’s crew
Jobsite Location
External Waterproofing-Parkdale St, Pickering