Roger’s crew waterproofed 22ft at rear wall, full left wall, front wall and 15ft on right wall. The crew removed and disposed of owner’s shrub and added a vertical drain in the front window. Excavation was done to weeping tile, and 4″ weeping tile with filter with 3/4 clear gravel added above.
Hydro-guard commercial rubber was applied once the foundation wall had been cleaned and parged with hydraulic cement.
After the first layer of rubberized material has been applied, a waterproofing reinforcement sheet is applied to strengthen the first layer and then lastly followed by the second layer of Hydro Guard.
Sales Consultant: Daniel Maiorano
Crew: Roger’s Crew
Jobsite Location
External Waterproofing- Old Orchard Ave, Pickering