Project

External Waterproofing – Greenwood Cr, Brampton

Sales Rep: Daniel Maiorano
Crew: Omar

RCC Waterproofed 18ft on right side, starting at the front corner of the house. They tunneled 16″ below deck to over lap with the existing waterproofing. Downpipe was replaced and a vertical drain was added below the window.

Foundation type – Concrete


Jobsite Location

External Waterproofing – Greenwood Cr, Brampton