Waterproofed 19 linear feet of front block foundation wall and 8 feet along right side. Interlock was removed at the right hand side and to be re-installed 6 to 8 weeks after the waterproofing so that way the soil is settled. Wooden desk was also removed and disposed Learn more about our Toronto waterproofing services.
Jobsite Location
External Waterproofing for Homewood Av, Toronto, ON