Waterproofed 19 linear feet of front block foundation wall and 8 feet along right side. Interlock was removed at the right hand side and to be re-installed 6 to 8 weeks after the waterproofing so that way the soil is settled. Wooden desk was also removed and disposed Learn more about our Toronto waterproofing services.
Project