Sales Rep: Nicholas Theodorou Crew: Omar RCC excavated along the concrete foundation for 7ft, digging down 6.6 ft. Wall was repaired and waterproofed and weeping tile was changed. Jobsite Location External Waterproofing – Carmichael Dr, Whitby