RCC waterproofers uncovered a big section of the foundation wall, excavated a total of 15 linear feet! In this job, the team found quite a few cracks in the foundation and used hydrolic cement to seal them. From there, a new layer of Hydro Guard rubber membrane and DMX air-gap barrier was applied to the foundation. The final touch included installing a new drainage system with weeping tile and 3/4" gravel.
Learn more about our Hamilton waterproofing services.
Jobsite Location
External Waterproofing at Winston Bvld, Hamilton