Sales Rep – Den
Crew – Omar
RCC excavated and waterproofed 6ft at the back of the house starting at the back left corner. RCC reused the same window well and installed a new vertical drain. RCC also excavated foundation walls and waterproofed approximately 5ft on the right side of the house starting 8ft from the back right corner. RCC replaced a new window well.
Jobsite Location
External Restoration & Waterproofing – Hallen Rd (Brampton)