The crew waterproofed 30′ along the back wall. Excavation was done to weeping tile, and a 4″ weeping tile with filter and 3/4 clear gravel added above. Hydro-guard commercial rubber was applied once the foundation wall had been cleaned and parged with hydraulic cement. After the first layer of rubberized material has been applied, a waterproofing reinforcement sheet is applied to strengthen the first layer and then lastly followed by the second layer of Hydro Guard.
One old window well was reinstalled with a vertical drain.
If you are interested in these waterproofing services and would like to learn more, head over to our exterior waterproofing page.
Sales Consultant: Joe Romanelli
Crew: Noel’s Crew
Jobsite Location
External Restoration and Waterproofing- West Deane Valley Rd, Etobicoke