Joey’s crew excavated to weeping tile and installed 4″ weeping tile with filter, they were connected to existing discharge. The left wall starting at 6.5’ from the front wall for 5 was restored, and waterproofed. Sub soil drainage membrane was installed also.
The crew moved the hollow concrete step to the side and used a tarp for fill.
Sales Consultant: George Stoetes
Crew: Joey’s Crew (GTA)
Jobsite Location
External Restoration and Waterproofing-Sweetbriar Crt, Pickering