External Restoration and Waterproofing-Sweetbriar Crt, Pickering

Joey’s crew excavated to weeping tile and installed 4″ weeping tile with filter, they were connected to existing discharge. The left wall starting at 6.5’ from the front wall for 5 was restored, and waterproofed. Sub soil drainage membrane was installed also.
The crew moved the hollow concrete step to the side and used a tarp for fill.

Sales Consultant: George Stoetes

Crew: Joey’s Crew (GTA)


Jobsite Location

External Restoration and Waterproofing-Sweetbriar Crt, Pickering