Noel’s crew waterproofed 42′ along the left side and 4′ along the front. Approximately 20 slabs were placed to the side and 40 sq ft of concrete was removed. Excavation was done to weeping tile, and a 4″ weeping tile with filter and 3/4 clear gravel added above.
Hydro-guard commercial rubber was applied once the foundation wall had been cleaned and parged with hydraulic cement.
After the first layer of rubberized material has been applied, a waterproofing reinforcement sheet is applied to strengthen the first layer and then lastly followed by the second layer of Hydro Guard.
If you are interested in these waterproofing services and would like to learn more, head over to our exterior waterproofing page.
Sales Consultant: Joe Romanelli
Crew: Noel Crew
Jobsite Location
External Restoration and Waterproofing- Shelborne Ave, North York