Project

External Restoration and Waterproofing- Shaw St, Toronto

Canroy’s crew repaired a total of 44 lineal feet of foundation wall, cut, removed and disposed of
concrete walk approximately 30’’ wide and grade with gravel on completion.
They formed and poured new bench footing 26 lineal feet 12 inches deep from top of concrete
slab by 5’’ wide.

A  new frost wall was installed out of blocks and mortar behind walkout. New connection made from existing sump pump to floor drain approximately 20 lineal feet.

Sales Consultant: Rick Deagazio

Crew: Canroy’s Crew


Jobsite Location

External Restoration and Waterproofing- Shaw St, Toronto