Project

External Restoration and Waterproofing on Vermont Ave, Toronto

The crew restored and waterproofed 12 ft of left wall starting from the back and 5ft at back wall meeting walkout steps, then an additional 10ft at left wall starting 10ft from the back. Approximately 25 sq ft of interlock and 3 wood steps were removed. One new steel window well with vertical drain was installed by the crew.

 

Sales Consultant: Ramy Morcos

Crew: Ramy-HPC (GTA)


Jobsite Location

External Restoration and Waterproofing on Vermont Ave, Toronto