The crew restored and waterproofed 10 ft of the left wall starting 10ft from the front. Approx. 33sqft of interlock was removed and put to the side. Excavation was done to weeping tile, and a 4″ weeping tile with filter and 3/4 clear gravel added above.
Hydro-guard commercial rubber was applied once the foundation wall had been cleaned and parged with hydraulic cement.
After the first layer of rubberized material has been applied, a waterproofing reinforcement sheet is applied to strengthen the first layer and then lastly followed by the second layer of Hydro Guard.
If you are interested in these waterproofing services and would like to learn more, head over to our exterior waterproofing page.
Sales Consultant: Ramy Morcos
Crew: AGP
Jobsite Location
External Restoration and Waterproofing- John St, Markham