External Restoration and Waterproofing & Internal Water Management System on Hollingworth Dr, Scarborough

Omar’s crew installed an internal drainage system in the cold room for 22ft, repaired the floor breakage with concrete and discharged the floor drain for 10ft.
The crew excavated, restored and waterproofed the left wall starting at the front wall for 6ft, and the front wall starting at the left for 6ft. 12 sq ft of asphalt was sawed cut, removed and disposed of and a gravel bed for 12 sq ft was laid after the fill was returned.

An additional 6ft was added to the existing footage on the front wall and waterproofed starting at 6ft from the left wall for 6ft. The crew excavated, restored, and waterproofed the right wall starting at 13ft from the front wall for 5ft, 10 sq ft of asphalt was removed and disposed of.

Sales Consultant: George Stoetes

Crew: Omar Crew


Jobsite Location

External Restoration and Waterproofing & Internal Water Management System on Hollingworth Dr, Scarborough