The crew excavated and waterproofed the back wall starting 4′ from the back left wall corner for 8′. Excavation was done to weeping tile, and a 4″ weeping tile with filter and 3/4 clear gravel added above. A new window well with a vertical drain & 3/4 stone inside was installed. 3sq ft of interlock was picked up and placed to the side.
If you are interested in these waterproofing services and would like to learn more, head over to our exterior waterproofing page.
Sales Consultant: Nicholas Theodorou
Crew: AA Crew
Jobsite Location
External Restoration and Waterproofing- Hettersley Dr, Ajax