The crew waterproofed the full right wall, 5ft at the rear plus 8ft at the front up to the stairs. 2″ insulation board was installed on the walls. Excavation was done to weeping tile, and a 4″ weeping tile with filter and 3/4 clear gravel added above.

Hydro-guard commercial rubber was applied once the foundation wall had been cleaned and parged with hydraulic cement. After the first layer of rubberized material has been applied, a waterproofing reinforcement sheet is applied to strengthen the first layer and then lastly followed by the second layer of Hydro Guard.

Two window wells were replaced and vertical drains were added. Weepers were connected to existing discharge.

Sales Consultant: Daniel Maiorano

Crew: Joey/Jessy’s Crew