Roger’s crew restored and waterproofed 30 FT of the front wall starting at the driveway going towards the front door and 4ft at the left wall. Approximately 65sqft of concrete was saw cut and disposed of. 80 sq ft of Interlock and 20 sq ft of asphalt was removed and put aside. Excavation was done to weeping tile, and a 4″ weeping tile with filter and 3/4 clear gravel added above.
Hydro-guard commercial rubber was applied once the foundation wall had been cleaned and parged with hydraulic cement. After the first layer of rubberized material has been applied, a waterproofing reinforcement sheet is applied to strengthen the first layer and then lastly followed by the second layer of Hydro Guard.
A new steel window well was installed with a vertical drain. The door sill was parged to bring the waterproofing up to the underside.
If you are interested in these waterproofing services and would like to learn more, head over to our exterior waterproofing page.
Sales Consultant: Ramy Morcos
Crew: Roger’s Crew
Jobsite Location
External Restoration and Waterproofing-Delta St, Etobicoke