The foundation wall on left side was repaired and excavation started at front corner for 9 lineal feet. Excavation was done to weeping tile, and 4″ weeping tile with filter and 3/4 clear gravel added above.
The crew removed and reinstalled the window well and installed a new drain.
Sales Consultant: Rick Deagazio
Jobsite Location
External Restoration and Waterproofing-Cavendish Drive, Burlington