Project

External Restoration and Waterproofing- Blairwood Terr, Scarborough

The crew excavated, restored and waterproofed the back wall starting at 18.5’ from the left wall for 5’. They then excavated, restored and waterproofed the right wall starting at 11’ from the front wall for 6’. Excavation was done to weeping tile, and a 4″ weeping tile with filter and 3/4 clear gravel added above.
The existing window well was removed and disposed up and a new window well was added with 3/4 stone and a vertical drain.

Sales Consultant: George Stoetes

Crew: J & M


Jobsite Location

External Restoration and Waterproofing- Blairwood Terr, Scarborough