The crew waterproofed the right wall starting at the concrete steps for 41’ towards the front. Excavation was done to weeping tile, and 4″ weeping tile with filter with 3/4 clear gravel added above. They saw-cut, removed, and disposed of 82 sq ft of concrete.
Hydro-guard commercial rubber was applied once the foundation wall had been cleaned and parged with hydraulic cement. After the first layer of rubberized material has been applied, a waterproofing reinforcement sheet is applied to strengthen the first layer and then lastly followed by the second layer of Hydro Guard.
If you are interested in these waterproofing services and would like to learn more, head over to our exterior waterproofing page.
Sales Consultant: George Stoetes
Crew: Mark-En Crew
Jobsite Location
Exterior Waterproofing- Taunton Rd, Toronto