Roy’s crew removed existing cement window wells and replaced with three new 42W x 12P x 22d galvanized window wells. A 28 ft section was waterproofed, they excavated and installed 4″ weeping tile with filter. The new weepers were connected to the 1/3 HP Liberty sump pump that was installed with a basket, lid, pump, check valve and discharge line. Upon excavation the cement window wells were sunk into the ground deeper than usual.
Sales Consultant: Kurt Tamowski
Crew: Roy’s Crew
Jobsite Location
Exterior Waterproofing & Sump Pump Installation-Betzner Ave N, Kitchener